Advantest 93k Tester Manual
Proper docking procedures ensure the test head is aligned with the wafer prober or handler to avoid physical damage.
Digital testing relies on executing functional patterns (vectors) to verify chip logic.
Before applying power, you must create a Pin Configuration file. This matches your device's signal pins, power pins, and ground pins to the corresponding tester resources (e.g., DPS lines or digital channels). Levels and Timing Setup Define the voltage thresholds ( Vihcap V sub i h end-sub Vilcap V sub i l end-sub Vohcap V sub o h end-sub Volcap V sub o l end-sub ) and Device Power Supply (DPS) values. advantest 93k tester manual
Need specific page numbers or a diagram from the 93K manual? Contact Advantest support directly with your system’s serial number for the most accurate, up-to-date documentation.
The exact pin states (e.g., 0 for drive low, 1 for drive high, L for expect low, H for expect high, X for mask). Waveform Tables (WFT) Proper docking procedures ensure the test head is
The Test Flow manual explains how to string individual tests together.
[Init Phase] └── Load patterns, levels, and timings into tester hardware. [Execute Phase] ├── Drive power to the DUT. ├── Run digital vector patterns. └── Strobe output pins to check for matching data. [Hardware Readback Phase] ├── Measure current/voltage values from functional pins. └── Compare measured values against your Limit Table. [Binning Phase] └── Send "PASS" or "FAIL" flag to the handler/prober. 🔍 Troubleshooting with the Manual This matches your device's signal pins, power pins,
This public link is valid for 7 days and shares a thread, including any personal information you added. This link or copies made by others cannot be deleted. If you share with third parties, their policies apply. Can’t copy the link right now. Try again later.
You replace the correct fan module in 10 minutes instead of swapping power supplies for hours.
: Power on the workstation and mainframe. Run the Daily Check or Focus Calibration to ensure pin accuracy and signal integrity. Loading a Test Program : Load the Level File (.lev) to set voltages and timing.